Mathematical Model for Hydropower Plant (HPP) Electricity Forecasting with High Time Resolution
Viktor Alexiev; Boris Marinov; Vasil Shterev; Rad Stanev; Bozhidar Bozhilov
- Published
- Publisher
- MDPI AG
- Journal / collection
- Energies
- Research area
- Energy & infrastructure
- Source type
- Journal article
- DOI
- 10.3390/en19092217
The original publisher provides the full text and its access options.
Cite this source
Viktor Alexiev; Boris Marinov; Vasil Shterev; Rad Stanev; Bozhidar Bozhilov. Mathematical Model for Hydropower Plant (HPP) Electricity Forecasting with High Time Resolution. Energies. 2026-05-03. https://doi.org/10.3390/en19092217