Bottleneck-Induced Lead Time Variability in Metal-Enclosure Manufacturing
Joseph Javier Sanchez Acuña
- Published
- Publisher
- Elsevier BV
- Research area
- Industrial systems
- Source type
- Preprint / posted paper
- DOI
- 10.2139/ssrn.7244361
This is a preprint or other posted paper. Check the original source for its review and publication status.
The original publisher provides the full text and its access options.
Cite this source
Joseph Javier Sanchez Acuña. Bottleneck-Induced Lead Time Variability in Metal-Enclosure Manufacturing. Elsevier BV. 2026. https://doi.org/10.2139/ssrn.7244361