Skip to content
Independent research & intelligence
OPEN VARIABLE

Evidence-First Signal Intelligence

Menu

Research literature / Conference paper

A Fast Evaluating Method for Reserve Capability Region of Interconnected Power Grid Considering Temporal Coupling Constraints and Multiple Meteorological Factors

Zhongxi Ou; Lihong Qian; Sui Peng; Weijie Wu; Zhen Xiang; Dewen Li; Jiajun Lin; Wei Dai

Published
Publisher
IEEE
Journal / collection
2025 4th International Conference on Power System and Power Engineering (PSPE)
Research area
Energy & infrastructure
Source type
Conference paper
DOI
10.1109/pspe66589.2025.11296401

Read the original source ↗

The original publisher provides the full text and its access options.

Cite this source

Zhongxi Ou; Lihong Qian; Sui Peng; Weijie Wu; Zhen Xiang; Dewen Li; Jiajun Lin; Wei Dai. A Fast Evaluating Method for Reserve Capability Region of Interconnected Power Grid Considering Temporal Coupling Constraints and Multiple Meteorological Factors. 2025 4th International Conference on Power System and Power Engineering (PSPE). 2025-09-19. https://doi.org/10.1109/pspe66589.2025.11296401

Download RIS