Optimizing Lean Manufacturing for Timely Product Completion in Project Manufacturing Company: A Case Study
Rini Oktavera; Dimas Aditya Yudistira; Iga Sri Deviyanti; Moch Ainul Fais
- Published
- Publisher
- Penerbit UTHM
- Journal / collection
- International Journal of Integrated Engineering
- Research area
- Industrial systems
- Source type
- Journal article
- DOI
- 10.30880/ijie.2025.17.05.012
The original publisher provides the full text and its access options.
Cite this source
Rini Oktavera; Dimas Aditya Yudistira; Iga Sri Deviyanti; Moch Ainul Fais. Optimizing Lean Manufacturing for Timely Product Completion in Project Manufacturing Company: A Case Study. International Journal of Integrated Engineering. 2025-08-31. https://doi.org/10.30880/ijie.2025.17.05.012