Reading paths / Capacity & delivery

When does announced capacity become usable?

Follow a project from its commercial commitment to the evidence of working infrastructure.

Latest included publication update:

Your reading desk →

Read in sequence

6 readings
  1. Signal

    Crane restart: from target date to working power

    Follow the Crane restart across its announced schedule, regulatory decisions and evidence of electricity generation.

    Read →
  2. Analysis ·

    One power project, three clocks

    The Crane nuclear restart shows why a power contract, a regulatory milestone and an operating date belong on separate timelines.

    Read →
  3. Analysis ·

    The bottleneck after the chip

    AI investment becomes useful only when a chain of physical systems starts working. The next question is who can deliver the connection.

    Read →
  4. Analysis ·

    A generation queue is not a data-centre queue

    Berkeley Lab’s 2026 edition is a valuable dataset with a specific unit of observation.

    Read →
  5. Analysis ·

    The grid capacity hidden in plain sight

    Better use of existing networks can open a faster route to power. The difficult part is turning technical potential into a dependable connection.

    Read →
  6. Research brief ·

    From announced capacity to working infrastructure

    An evidence protocol for following AI projects across chips, power and capital.

    Read →

Original source references

Export references ↓

Documents cited by the included readings. Check each publisher for the current version, full text and reuse terms.

External source · Lawrence Berkeley National Laboratory ·

Queued Up: 2026 Edition

Generation interconnection queues; not a data-centre load connection census.

View original