Skip to content
OPEN VARIABLE

Evidence-First Signal Intelligence

Menu

Research literature / Journal article

Material Transfer Planning between Semiconductor Fab and Probe Facility with Respect to Minimizing Demand Tardiness

Young-Ho Cha; June-Young Bang

Published
Publisher
Future Convergence Technology Research Society
Journal / collection
Asia-pacific Journal of Convergent Research Interchange
Research area
Semiconductors
Source type
Journal article
DOI
10.47116/apjcri.2025.02.33

Read the original source ↗

The original publisher provides the full text and its access options.

Cite this source

Young-Ho Cha; June-Young Bang. Material Transfer Planning between Semiconductor Fab and Probe Facility with Respect to Minimizing Demand Tardiness. Asia-pacific Journal of Convergent Research Interchange. 2025-02-28. https://doi.org/10.47116/apjcri.2025.02.33

Download RIS