Response time optimization method of power grid mobile platform considering maximum concurrent users
Xingfu Zhang; Sheng Gui; Bo Hu
- Published
- Publisher
- IEEE
- Journal / collection
- 2024 6th International Conference on Energy Systems and Electrical Power (ICESEP)
- Research area
- Energy & infrastructure
- Source type
- Conference paper
- DOI
- 10.1109/icesep62218.2024.10652114
The original publisher provides the full text and its access options.
Cite this source
Xingfu Zhang; Sheng Gui; Bo Hu. Response time optimization method of power grid mobile platform considering maximum concurrent users. 2024 6th International Conference on Energy Systems and Electrical Power (ICESEP). 2024-06-21. https://doi.org/10.1109/icesep62218.2024.10652114